| |
Back
X-Cal Resources Ltd.
TSE/XCL May 17, 2006
Link to
printable version of this news release (Adobe Acrobat required).
100% of Sleeper to X-CAL
SLEEPER GOLD PROJECT
The Sleeper Gold Project located in Humboldt County, Nevada, has been
consolidated 100% into X-CAL Resources Ltd.
X-Cal has paid $CAN 5 Million and 10 million common X-Cal shares to New
Sleeper Gold Corporation for its 50% interest. The common shares issued to
New Sleeper are subject to a two-year escrow agreement. One quarter of New
Sleeper’s shares will be released for trading every six months, in four
equal amounts, over the two-year time frame.
The transaction has doubled X-Cal’s interest in the Sleeper Gold Project and
achieved a very important step forward.
A private placement of X-Cal common stock (see April 27/06 Press Release) @
$Can 0.28 was oversubscribed and increased to 34 million shares for gross
proceeds of $ CAN 9,520,000. A portion ($CAN 4,950,000) of these funds has
been utilized to complete the Sleeper Consolidation Deal. The balance of the
private placement proceeds, less any finder’s fees, will be added to X-Cal’s
general working capital.
A vote of 97.63% of ballots cast at a Special X-Cal Shareholders Meeting
authorized private placements to both fund the cash portion of the Sleeper
Consolidation Deal and also to fund a major exploration program at Sleeper
(see April 27, 2006 Press Release). To date less than half of these
authorized shares have been issued. Two major mining companies have written
to X-Cal indicating that they wish to discuss funding of exploration at
Sleeper through potential development. Management will compare the merits of
an offering of X-Cal shares, at higher prices, with specific proposals that
may be forthcoming from these mining companies.
A summary paper by Dr. Richard Sillitoe describes 5 priority, mine scale
targets at Sleeper. All five of the priority targets are permitted for
drilling.
Detailed mapping and sampling on one of the targets known as the “Range
Front” is in progress. Preliminary drill testing of this target can be
funded from our current treasury, as soon as a drill becomes available, with
an initial budget of $US 1,000,000.
The current NI-43-101 report recommends a $US 15,000,000 work program for
the Sleeper Property. The technical report is available on SEDAR or @
www.x-cal.com.
X-Cal has a team of professionals, with Nevada track records, who are
applying their combined experience to the project (see previous news
releases for description of exploration team).
X-Cal is also initiating an immediate program to re-evaluate the potential
of above ground gold at Sleeper. Historical reconciliation studies, based on
blast hole assays from mining operations at Sleeper, showed a significant
difference between the number of ounces mined and what was recovered. The
difference is assumed to be above ground in the heap leach pads, tailings
pond and waste dumps. These studies were initiated during a time of lower
gold prices. The historical work is not in NI-43-101 format.
Management is pleased to report that 100% of the Sleeper Gold Project is now
in X-CAL.
CORTEZ AREA
X-Cal also has two early stage properties in the Cortez Area, Lander County,
Nevada: the Mill Creek “Goat Window” Property and the Reese River “Horse
Mountain Window” Property. Both properties are located over prospective
lower plate windows.
The contents of this release have been reviewed by Larry Kornze, P.Eng, who
is a “Qualified Person” as defined by NI-43-101.
Shawn Kennedy
President
Caution Concerning Forward-Looking Statements
This release and related documents may contain certain “forward-looking
statements” including, but not limited to, statements relating to
interpretation of drilling results and potential mineralization, future
exploration work at the Sleeper Gold Project and the expected results of
this work. Forward looking statements are statements that are not historical
facts and are subject to a variety of risks and uncertainties which could
cause actual events or results to differ materially from those reflected in
the forward-looking statements, including, without limitation: risks related
to fluctuations in gold prices; uncertainties related to raising sufficient
financing to fund the planned work in a timely manner and on acceptable
terms; changes in planned work resulting from weather, logistical, technical
or other factors; the possibility that results of work will not fulfill
expectations and realize the perceived potential of the Sleeper Gold
Project; uncertainties involved in the interpretation of drilling results
and other tests; the possibility that required permits may not be obtained
in a timely manner or at all; risk of accidents, equipment breakdowns or
other unanticipated difficulties or interruptions; the possibility of cost
overruns or unanticipated expenses in the work program; the risk of
environmental contamination or damage resulting from the exploration
operations at the Sleeper Gold Project.
Forward-looking statements contained in this release and related documents
are based on the beliefs, estimates and opinions of management on the date
the statements are made. There can be no assurance that such statements will
prove accurate. Actual results may differ materially from those anticipated
or projected. X-Cal Resources undertakes no obligation to update these
forward-looking statements if management's beliefs, estimates or opinions,
or other factors, should change.
For further information contact: Shawn
Kennedy, President
Tel: (604) 662-8245 Fax: (604) 688-7740
Visit our web site: www.x-cal.com
Note: X-Cal Resources Ltd. can be
referenced through the Standard & Poors Directory.
The 2005 Annual Report is available through X-Cal Resources Ltd.
Back |
|